Showing posts with label Unst. Show all posts
Showing posts with label Unst. Show all posts

Thursday, August 11, 2011

Unst Stole: Inching Forward

The Unst Stole by Sharon Miller (Project #7 in Heirloom Knitting) is currently my longest-standing WIP, and after 2+ years I am eager to finish it up as soon as I possibly can. But, as Treebeard would say, Let's not be hasty... It's not really up to me anyway. This project insists on setting its own pace, because it is incredibly painstaking, and anytime I try to rush, or work on it under less-than-perfect lighting conditions, or when I am tired and/or not fully alert, I always live to regret it. So, frustrating though it may be, I have learned and must continually remind myself that slow-and-steady is the ONLY way to make any real progress. It will all be worth it in the end.

Fortunately, I have managed to devote quite a bit of time to the Unst lately, so there are some very encouraging results, although my hope (wish??) from this earlier blog post that it might actually be done by the end of summer will almost certainly prove to have been overly optimistic. By the end of the year is more like it, or maybe before the snow flies. We'll see. At any rate, the good news is that I can now report (with pictures!!) on all three sections of the pattern: center, borders, and edging.

I. Center
It took me three tries with two embarrassingly long hiatuses in between to get through the 476 rows of my modified center pattern, but on May 1st I finally reached that point. I did a total of 9 repeats, beginning and ending with a framing band of mirrored ferns and alternating in the middle between the original pattern and an adaptation of the Shetland Twins motif. Here's an old picture of the bottom frame and the first several repeats, plus a new one showing the entire center. Click on either thumbnail to get a closer look.

II. Borders
The Unst borders have always been my favorite part of Sharon Miller's design. There is something about the delicate lace trellis with its different diamond motifs, each of which is distinct and yet beautifully harmonized with the others, that I find utterly captivating. My one complaint is that the 136 rows of the original charts are over too quickly. That's not a lot of yardage, especially at the tiny gauge that I get with Gossamer CashSilk and 1.5 mm (US 000) needles. So for my stole I decided to double the length of both border panels, which should dramatically showcase the trellis/diamond pattern when the piece is worn.

Below are three photos to illustrate exactly what I did, since I did not simply repeat the charts as written. The top photo shows the frame separating the border from the center below it, and the beginning of the first border panel. In the lower left you can see how it looked when both charts were complete (June 6th). According to the original design, the body of the shawl would have stopped there. Note that there are 5 full diamonds in the trellis, each containing a different pattern (ABCDE), with half-diamonds above and below. I replaced the motif in rows 1-11 (i.e. the bottom half-diamond) with the more symmetrical/rounded one found on p. 218 of HK, and also wrote out a chart to complete the half-diamond at the top (F), which enabled me to continue the trellis with the original series of diamond motifs in reverse order: ABCDE-F-EDCBA, ending with the substituted 11 rows once again. The result is perfectly mirrored and balances nicely. I finished the 1st border panel on June 18th, and was amazed at how effortlessly my two-year-old provisional cast-on allowed itself to be unraveled so that I could start the 2nd identical panel, which I FINALLY finished on July 17th, bringing the stole to 70% completion, with only the edging left to round the whole thing off. As always, click on any of these pictures to get a closer view. I recommend this for the largest one in particular, which does not show up very well on a small scale.

III. Edging
Make no mistake: the edging may feel like an afterthought to the body of the stole, but it is a MAJOR undertaking all by itself, representing 30% (i.e. nearly 1/3!!) of the stitch-count for the project as a whole. The original Unst stole edging with its boxy squares in garter-stitch has always struck me as rather clunky, so I went hunting through Heirloom Knitting again and chose a more delicate pattern that seemed to strike just the right note. It is called the Queen’s Lace Edging (HK, p. 129) and fortunately has the same 20-row repeat as the original. It already includes a strip of faggotting along the inner edge, but I decided to incorporate the spider-hole insert from the original design as well.

A kind friend on Ravelry helped me do the math, which came out to a satisfyingly even total of 150 points: 20 across each of the short sides and 55 up/down the long sides, with sufficient ease before and after each corner to make the turns and still lie flat. The same Ravelry friend also advised me to go ahead and pick up stitches all the way around the stole on a long circular needle — 1420 of them, to be exact — to which the edging could then be attached. This took the better part of a day and was an ENORMOUS headache at the time (I won't pretend otherwise), but all that work up-front turned out to be a terrific investment. The Big Win was that it enabled me to double-check the spacing and stitch-counts and make minor adjustments in advance, rather than trying to do this on-the-fly and quite possibly having to rip out portions of the lace itself if something went awry. Now that I have all the stitches neatly held in reserve with markers at intervals to help me count, I no longer have to worry about whether the spacing will come out right and can therefore concentrate on the actual knitting, which poses enough of a challenge all by itself.

This third and final series of photos contains a close-up of the first 3 edging points, a wide shot of the entire stole, showing all the stitches bunched up on the circular needle with markers every 20 stitches along the edges and every 10 stitches near the corners, and finally my most recent picture showing the first *10* edging points (= halfway across the first short side).

The Queen's Lace is a 20-row repeat, as I mentioned, and the spider-hole insert is a 6-row repeat, so they line up together only occasionally (i.e. once after 1.5 repeats of the main pattern and again after 3 full ones). It's intricate and fiddly, with the added complication of working left-handed (chart dyslexia, anyone?). I think there's just a learning-curve and that it will speed up once I get the hang of how everything fits together. But I've been at it for several weeks now and still haven't turned the 1st corner, because I kept having to rip out bits. Two steps forward, one step back. Yesterday after yet another minor setback, I did manage to knit three or four points in a row without mishap, so maybe it will finally start to go more quickly from now on. That would certainly be nice, because at the rate I've been going so far, I estimate that it would take another 8 MONTHS or more to finish. Sigh. Clearly, no matter what, this edging is going to be with me for quite a while. Slow and steady, slow and steady, slow and steady...

Tuesday, June 15, 2010

Progress Report (1 week later): 3-1+1 = SUCCESS

My stated goals for the opening bout of summer knitting after the landmark "12 weeks/12 projects" post were three-fold: finish the stained glass bag and the back of the Candlelight Kimono, and keep working on the beaded edging for the Evenstar.

Well... After getting through the first task in short order (obviously enough), I then went out of town for the long weekend to attend my 25th high school reunion, which was also remarkably the 350th anniversary of the school's founding back in 1660. I actually wore the bag to the reunion. You can see it peeping out in various photos that people have posted. So that felt like a significant victory.

I am also happy to report that I managed to stay on track over the weekend and have now completed the back of the kimono and gotten started the two fronts, which I decided to knit side-by-side in aid of the symmetrical shaping at waist and neckline. Here are some pictures as proof that I am not just telling make-believe stories. Click on any one of them to take a closer look.

I decided for a bunch of reasons (mainly luggage constraints and for the sake of practicality) not to travel with any beaded lace projects, and so I did not make any progress on the Evenstar over the weekend. But I DID bring along the Unst stole, and I was able to work on it quite extensively en route in both directions and in between as well.

It felt a bit awkward at first, picking it up after so long a hiatus. I definitely had to re-familiarize the muscles in my fingers with the tiny movements demanded by knitting with gossamer yarn and 1.5 mm (US size 000 needles). So I started by tinking back several rows, partly to make sure that I knew exactly where I was on the chart, and also to get used to handling it again. But by the time I had made my connection and embarked on the second leg of my journey on Thursday afternoon, I was already moving forward with confidence. And when I landed yesterday at my home airport, I had added several inches to the unblocked length of the piece. To put it another way, I stopped knitting a year ago with 4 out of 9 repeats of the modified center pattern complete (see left, which is a closeup from an old photo rather than a whole new one), and I am now 3/4 of the way through the *6th* pattern repeat. LOTS of happy progress!! Other projects are beckoning and will have to take priority in the next 2-3 weeks, but nonetheless I would be very pleased to finish the center and move on to the border patterns by the end of this month.

All of which means that I set out last week to do three things, and did two of them plus another unexpected one that was slated to happen soon. So I hereby officially proclaim this first bout of knitting a success.

Tuesday, June 8, 2010

"In the first week of summer, a knitter on a spree made progress with these WIP's..."

*TWELVE*.

That's how many weeks are left now until school starts again at the end of August.

It's also how many WIP's (i.e. works-in-progress) I currently have piled up on my Ravelry profile. I just took total stock for the first time in a while. Eeeep!! Obviously there's no one else to blame for this over-exuberance. I let it happen, and I am not afraid to admit that. Yet even though I saw myself giving into a certain amount of "start-itis" over the past couple of months, I never meant to let it get quite so much out of hand. I guess that's what comes from not really keeping count of new projects, or more accurately from discounting (i.e. ignoring) certain long-term ongoing — I suppose the technical term is hibernating— ones.

But however this absurd / lamentable / crazy-making state of affairs came about, there is clearly no good reason why it should be allowed to continue. So... I have decided to dedicate the bulk of my summer knitting this year to wrapping up as many works-in-progress as I can. One of them I actually expect to finish as soon as today or tomorrow, and several more by the end of this month. July and then August will each see their share of completions in turn as well. Yet tempting as it might seem to do some simplistic math and set up an elaborate, regimented scheme for getting them *all* done by the end of the summer (e.g. 12 projects / 12 weeks = 1 project per week on average), I WILL NOT GO THERE. It would be silly, unrealistic, and joy-killing in the extreme to put that kind of undue pressure on myself. The projects are at different stages of development, ranging from 95% complete to just getting started. Some of them will no doubt continue into the fall/winter and beyond, but the goal is to make demonstrable headway on each and every one of them in the next dozen weeks.

Plain old common sense dictates that I adopt such a plan, and there is a financial incentive too. I would like to avoid undue expenditures wherever possible, and it should be easy to stay on track with so much already in the works to keep me occupied sans new purchases. I do have a wish-list, of course (what knitter doesn't?), most notably including Silk Thread or maybe Silk Thread II from Blue Moon Fiber Arts in one of the Raven colorways for Anne Hanson's Irtfa'a farose shawl and Gossamer CashSilk from Heirloom Knitting in *black*, which they recently made available partly at my urging. I would also like to acquire a woolly board for the guernseys when the time comes. But all of these things can wait until August, when I should have some birthday money to throw around.

Meanwhile there are these twelve ongoing projects spread out here in front of me, including five lace pieces (four beaded and one gossamer), five sweaters, a pair of colorwork mittens, and a felted bag. My goals for each of them are as follows. Click on any of the image thumbnails to get a closer look...

[1] At the very top of the list, because it is the closest of the entire bunch to being 100% finished, comes my Ravelympics 2010 Stained Glass Felted Bag. It was all but wrapped up back in February, needing only a lining and shoulder straps to pronounce it "D-U-N done." I even purchased some appropriately cheerful lavender lining fabric weeks ago, but then I did not get a chance to tackle the actual cutting and sewing until just yesterday. It was a tricky little bit of seamstress work, if I do say so myself, and I will devote an entire post to the finishing process, also including the knitting, felting, and attachment of the shoulder straps, as soon as the project is successfully completed. It will be nice to check off at least one item right away. :-)

[2] The second item is actually new to the blog. Somehow I never got around to mentioning it, but right after the Ravelympics I started a pair of the ever-popular Fiddlehead Mittens using some jewel-toned Borgs Vävgarner S.N. 2 garn from the depths of my stash. I got the body of one mitten done in short order and ordered some yummy alpaca yarn for the linings, before my life became too hectic and the weather too warm to think about mittens anymore. So I put the project away for a while. The first one did not take more than a day or two to knit, though, so I will get the second one finished at some point during the summer, whenever the mood strikes, and then try to have them both lined and ready to wear before the snow flies. No huge rush on this project, then, but not a big deal to wrap it up either.

[3] I may have waited nearly 20 years to say it, but as I mentioned in a recent post, the lavender-blue silk Candlelight Kimono is happening VERY fast. Sometime in the next few days I should actually have the back finished and start the two fronts. After that it will require only short little sleeves and some careful blocking and sewing to ensure a proper fit and drape to the fabric. But even so, I will be frankly *astonished* if I do not have the option of wearing this sweater for the July 4th holiday.

[4] Based on actual start-dates (as opposed to yarn acquisition), the single longest-standing item on the incomplete list is my sweater tribute to Frejya, our fluffy orange Maine Coon cat. The front took me no more than a week to knit, but that was 3 years ago!! First I procrastinated mightily over weaving in all the loose ends produced by the intarsia. Then I took almost as long again with the duplicate-stitch embroidery. But the latter is 85% complete, and I will see to it that it gets the rest of the way done during June. I have already started the back of the sweater, which is slated to have a goldfish bowl on it. More intarsia and embroidery there, alas, but thankfully on a smaller scale than the front. So I will aim to complete the knitting in July and the embellishments in August. Then (mirabile dictu) the sweater will need only sleeves and a collar — oh, and a fuzzy dangling Main Coon cat-tail!! I would love love L-O-V-E to wear it at Christmas. So help me, then, oh ye Gods of needlework, this project *will* be done in 2010...

[5] My husband's Stornoway is coming along nicely, though at a rate consistent with the 2.5 mm (US size 1+) gauge, and is now missing only the sleeves. I recently acquired the 24" circular needle required for the upper portion of the arms and have picked up the first round of sleeve stitches. My goal is to finish one sleeve in July and the other in August, thus ending Phase I of the Great Guernsey Adventure, which was launched here last July. Since I fully expected the His & Hers project to take at least a year all along, everything looks to be more or less right on schedule.

[6] Since I did not actually cast on for my Eriskay until late November, I do not expect to finish it anytime soon. But I have made quite a bit of progress on it lately, since completing the ribbing. In fact, the body now measures 6 1/2" , which is already more than halfway to the base of the armhole gussets!! So I will try to reach the armholes sometime in the next few weeks and maybe get through the front and back yokes (or at least one of them) by the end of the summer. Then again, I am not in any great hurry and can always recalibrate the timetable if need be.

[7] The fifth and final sweater on the list, which I have dubbed "Peggy Tudor," went into quasi-hibernation in early October, when I completed the second of the four large body panels and laid the next two aside in deference to other things. I have deliberately never set any timetable for this painstaking (dare I say 'monumental'?) project, preferring to emphasize quality over quantity in my overall approach to it. I do not want it to go on forever, though, and it would be nice to start seeing some real progress again in the not-too-distant future. Indeed I would like see if I could have all the remaining body pieces done by the end of the summer. That's two side panels and four openwork panels, so not entirely out of reach, depending on how the time goes. As with Eriskay, though, I will take stock of things in July and adjust my expectations as needed. I will order the buttons before long, though, following the lead of a fellow Raveler who put me onto this magnificent solution to the otherwise vexing button problem. So the work goes on...

[8] Among the lace projects, the one closest to completion is the Evenstar. As described in my recent update, I continue to plug away at the beaded edging, a few points at a time. I try to do at least a little bit every day. Sometime very soon, although I won't pledge myself to an exact date, I should reach the halfway point. My goal is to finish the shawl in time for my sister-in-law's wedding in mid-July. I should manage it with ease, if I just keep working at the slow-but-steady pace that I have established.

[9] The American Beauty shawl could move up and become my "front-line" beaded project when the Evenstar is out of the way, but I will not force the issue if other things seem to take priority instead. I am enjoying it immensely, as I intimated not long ago, and I fully intend to savor it for as long as it lasts. So I will continue to work on it whenever the mood strikes and trust it to keep growing at a reasonable rate without applying any undue pressure. This is one where the best plan will be to set no timetable whatsoever and simply let nature take its course.

[10] Remember the Unst Stole? I have done nothing and said nothing about it for a very long time, but I have not lost sight of this delicate piece that I started last summer as a kind of coda to the Princess Shawl. It was driven into hibernation by the sudden arrival of beaded lace, and then kept there by a succession of other projects that came along to grab my attention. Truth be told, I was ready for a break from gossamer knitting after the Princess, even though it took me several weeks of gradual "detox" to realize it, whereby I started this follow-up project. But the better part of a year has gone by since then, and I have been meaning for a while now to pick up the 1.5 mm (US size 000) needles and get back to work. The Platinum colorway in the Gossamer CashSilk has always reminded me of Tolkien's mithril, full of magic and mystery and lore. I have done two full repeats so far of the complex alternating body pattern, and it will need either 4 1/2 or 5 1/2 repeats in all, plus the second "frame" band, before I can move on to the diamond border that is my favorite aspect of the design. I am reluctant to set a firm goal before actually taking a hand to it, so that I can get a sense of how a reasonable pace will look/feel, but roughly speaking let's watch for me to start knitting it again during June and to finish the body in July/August. Then I will work on the borders, and I might aim to have the rest done by mid-winter or spring break. Something like that, anyway.

I have not written about the last two items on the list. They are both beaded lace and belong to the Christmas 2010 Project. I don't think either of the intended recipients pays any attention to my blog, but I will try not to give too much away here. There is more information on my Ravelry profile.

[11] I started working with this skein of Unique Sheep Eos (50% merino, 50% tussah silk) in late March. It is in the Earthfaire-exclusive colorway called "Deep Forest," and I am making a beaded lace scarf/stole with a delicate motif appropriately based on woodsy foliage. The pattern comes from one of my favorite designers. I am nearing the halfway point already and hope to have the whole thing done by August 1st or thereabouts.

[12] Last but not least, I had no business casting on for Yet Another Beaded Lace Project, but I had been thinking about this one and looking forward to it for so long that I finally gave in a few weeks ago and got started anyway, just to see what it would look like. I am using a 100% organic cotton yarn (Pakucho Lace) from EcoButterfly and some magatama beads in a drop-dead gorgeous colorway called garnet-lined transparent topaz AB. The pattern comes from another one of my favorite designers. I have done only a few inches so far of what will eventually be a substantial stole, but it is very open lacework on 3.25 mm (US size 3) needles, so the knitting should go quickly when I finally get a chance to focus on it, which is highly unlikely to happen until August.

So I have my work cut out for me, as the saying goes. To recap the stated goals in a slightly different (i.e. chronological) format:

*Phew*. That was a long haul, and no mistake. But it feels really good to have typed all this up. For one thing, the blog is now completely up-to-date. No more "hidden" or undocumented projects lurking in the wings!! What a relief. It is always a balancing act between knitting and blogging, but maybe now that I don't have to focus quite so much on catching up with the latter, I can spend a bit more time on the former. From now on, periodic updates throughout the summer can refer back to this post by way of holding myself accountable for the goals that I have set. I have placed a convenient marker beside each of the twelve entries to facilitate that process via precise hyperlinks.

Of course, setting goals can be dangerous, especially when you declare them publicly. If I should fall behind at any point, however, let me say right up front that there will be no guilt or recrimination, only adjustments to the timetable. After all, more than anything else I need this to be FUN and RELAXING. :-)

Monday, June 8, 2009

Royalty is a tough act to follow, but...

I think I may have mentioned it once already, but I am *addicted* to the CashSilk yarn. I feel as if I'm chain-smoking with this stuff, even though I've never held a lighted cigarette in my entire life. Here's what I mean: as the Princess Shawl was nearing completion, I made sure to order my next installment of CashSilk so that it would arrive in plenty of time before I finished, and I cast on for the new project literally less than 24 hours after the washing & blocking extravaganza described in my previous postings. I've pretty much resigned myself to the fact at least for now that I simply MUST have one CashSilk project on the needles at any given moment. No more than one at a time, certainly, but at least one, always. That's just how it is.

But where to next? I mean, how on earth do you follow up on something as splashy and ornate and over-the-top as the Princess?

Well, for one thing, LESS IS MORE. I was ready for a project on a smaller scale, where I could enjoy the forgotten pleasure of knitting with less than 200 stitches across and actually see progress on an hourly basis rather than having to wait days or even weeks for my effort to produce a measurable difference. I also wanted something that I could actually expect to wear. Occasions that would call for a lavish garment like the Princess shawl are few and far between in my world!!

So for a bunch of different reasons I chose the Unst Stole from Sharon Miller's book Heirloom Knitting (p. 261). It's just the right size for my purposes right now as a "Princess knitter in recovery," and I've always loved the design, especially the scrumptious border (also seen on this shawl pattern, which is the first in Sharon's collection and a very close cousin of the Unst stole).

Oh! And I almost forgot to add that a new colorway in the CashSilk was released just in time for this project. It's called Platinum, and as a sterling silver jewelry fanatic, I adore this alternative to the pearly white yarn traditionally used for fine lace. The moon-glow gossamer thread is like knitting with a strand of mithril. Fabulous.

Along the way, while laying the groundwork for this project and reading through the book, I started exploring the possibility of designing my own lace shawl(s) someday, based on the traditional motifs. To that end, Heirloom Knitting is a wonderfully *RICH* resource, containing not only an extensive individual pattern library (centers, borders, edgings, and grids) but also various tools and guidelines to help ease beginners into the complexities of designing whole elaborate pieces. Sharon addresses such topics such as the selection and layout of patterns and techniques for the construction of various shapes (e.g. borders-inward vs. borders-outward), as well as aesthetic issues like balance, symmetry and proportions & how to do the necessary calculations too.

These design discussions are specifically aimed at the novice and so remain very much on an introductory level. Indeed sometimes their tone almost verges on the coy or flirtatious. For they seek to spark curiosity and inspire creativity, rather than to instruct in any detail. But since I have never designed my own lace before (having only ever followed patterns written by other people), they were pitched right at my level and I have found them very evocative. There are certain pages that I find myself turning to again and again, and each time that I do so, my understanding and appreciation grows deeper toward those who do design their own lace patterns.

Lately I have been particularly taken up with the concept of "frames," i.e. narrow patterned bands that serve to highlight and embellish the transition from center to border on a shawl. These intriguing design elements can appear singly or be layered several deep in a concentric fashion. There is a photo of an antique shawl on p. 216 of HK that I just can't seem to get out of my mind for some reason.

So I decided to try my hand at tinkering with the Unst Stole pattern a little, to see what it felt like to take some control over the design of a piece of lace.

I drew some confidence from the fact that this is a rectangular stole, with the two border panels placed (from the knitter's perspective) on the top and bottom of the center panel. All three of these elements are worked straight back and forth with the same number of stitches across throughout. No increases or decreases to keep track of or picky mitred corners to work out. That made it easier for me to take my first few tentative baby (or perhaps toddler steps) in the design direction.

There are some big decisions left that I will have to make at some point down the road, but here is what I know so far about my modified version of the Unst stole:

1. I decided to keep the original count of 185 stitches across for the center & borders, despite the small gauge of the CashSilk. One or two posters on the HK Yahoo Group suggested that their shawls, following the pattern as written, came out less long-and-skinny (i.e. with rather more width and less height) than they had hoped, so I did not feel any call to widen mine.

2. The layout of the stole precludes a 4-sided frame, but I thought it would be fun to experiment with a narrow band at top and bottom of the center panel, separating it from the two border panels. Using the mirrored version of the fern motif (p. 90), which is a cousin to certain visual elements found in the existing pattern, I decided to place a row with the ferns facing one way on the bottom of the center and another with the ferns facing the opposite direction on the top. I followed Sharon's instructions to do the math for the pattern repeats, and was pleasantly surprised to discover that the ferns would fit exactly when spaced only 3 stitches apart. I simply placed 6 rows of plain knitting and a break pattern row both above and below the fern motif. Nifty!!

3. Looking at various pictures of the Unst stole as knitted by Sharon Miller and others, I have always thought that the spider-hole lozenges appearing in the center pattern between alternating bands of spider webs look too square and boxy, allowing the webs to dominate the pattern rather more than I would like. So in order to achieve more of a balance, I decided to elongate them by incorporating 3 spider holes into each lozenge instead of 2.

4. Just for the fun of it, by way of introducing some additional complexity and visual interest, and with encouragement from Sharon Miller herself (offered via the HK Yahoo Group), I also decided to alternate bands of the traditional pattern known as the "Shetland Twins" (HK p. 139). After some charting & based on the arithmetic, I decided to make the lozenges for the Shetland Twins pattern contain 4 pattern repeats to balance the height of 3 spider holes. In fact, as it turns out, the Shetland Twins lozenges come out two rows taller than the spider-hole ones. Better that than 3 rows shorter, so there you are.

5. As of right now I am still not sure how many repeats of my extended pattern will be required to achieve the desired effect. It will be a choice between 9 total bands of lozenges (i.e. 5 of spider holes and 4 of the Shetland Twins) or 11 (one more of each type, i.e. 6 and 5, respectively). Depending on the ratio of width to height when the center is complete, I will most likely add to the borders as well, rather than keeping them the same size and letting the center account for any increase in the overal dimensions of the finished piece (as it did in my Princess shawl). If/when this happens, I will simply continue the existing diamond-shaped trellis grid and repeat three out of the four "filler" patterns in the reverse order: those patterns now go ABCD, but I would do them ABCDCBA.

6. Last but not least, while I am at it with all these other modifications, I will definitely choose my own edging as well. I have never much cared for the original one, with its chunky squares of plain knitting.

Well, that's all for now. Here are two pictures of my Unst Stole center as a WIP. The first one shows the bottom "frame" and the second is a closeup of the modified center pattern. As usual, just click on either image to see a larger view.